​West African Governments trust Skipper for Electrical Solutions

Skipper has been commended again by key stakeholders in West African Governments for the quality of electrical products as well as its strong EPC capabilities.
A team from Federal Minister of Power, Nigeria and Transmission company of Nigeria led by Mrs. Sapke Briskilla Ibrahim, Director (Distribution) visited Skipper factory in Bhiwadi, India on 5th & 6th July, 2017 for Factory Acceptance Test. It was a successful FAT on Skipper made Products.
Engr. Dahiru Isyaku, TCN during his visit said, ” Skipper is growing strength to strength. The new factory is very clean and provides conducive environment for dedicated personnel to operate.

With EHV Transformer manufacturing, Skipper is ready to compete other transformer manufacturers globally. The human resource is highly competent.” Skipper Nigeria has already completed its previous order of 2X60MVA, 132/33kV for the connection of Gurara Hydro Power Project to Kaduna State Industrial area and now is providing the balance material against the variation order. In domestic front, one of the most progressive utility Gujarat Energy Transmission Corporation Ltd. has awarded Skipperseil with vender development order for 500MVA, 400/220/33kV Transformer on the basis of State of art manufacturing facility at Bhiwadi factory. With this, Skipper has entered into the frontier of Extra High Voltage Power Transformers manufacturing.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s